ZinCo Green Roof Projects
- Project Data
- Area:
- Approx. 1.300 m² (13,993 sqft)
- Circuit length:
- 180 m
- Year of construction:
- 2005
- Landscape architect/project management:
- Ong & Ong
- Contractor:
- Yi Fong Construction Pte Ltd
Project Report: Subaru Headquarters, Singapore
Upper picture: The 6th floor of the Subaru Headquarters features a rooftop described as “Asia´s first multi-terrain test track, where customers can witness and feel Subaru´s AWD technology in action”.
The sand track allows a smooth gliding. Rocks, wooden sleepers, etc. were also integrated within the circuit.
Local palm trees were planted in a 1,20 m deep substrate layer.
View from a neighbouring building onto the roof of Subaru headquarters.
- Project Data
- Area:
- 2.160 m² (23,250 sqft)
- Year of construction:
- 2008
- Architect/Design:
- Carlos Subira, Barcelona
- Contractor:
- VALLIMPER, Terrassa
JARDINATURA, Terrassa
Project Report: Guitart Gran Hotel Monterrey, Lloret de Mar/Spain
Upper picture: The heavy duty driveways on the underground parking garage are driven by busses.
The heavy duty Stabilodrain® allows the use of vehicles during the installation.
You are not aware to be on top of a roof!